Disaster Recovery Projects
CSC knows that time is of the essence when you or your business has been hit with unforeseen damages and shutdowns. We can quickly evaluate the damage, recommend immediate steps for shoring and safety, and, if requested, assemble a design team with architects and mechanical, electrical, and plumbing (MEP) engineers that can accommodate a fast-paced design schedule to get repairs underway as soon as possible.
Henryville High School
In 2012, Henryville High School faced the devastating impact of an EF4 tornado reduced nearly 40% of the 200,000-square-foot structure to slab on grade.
Shipyard Panama City Beach
In 2018, a Shipyard in Panama City Beach, FL, faced the destructive force of Hurricane Michael, necessitating a comprehensive disaster recovery effort.
Woodbridge Apartments
In 2014, the Woodbridge Apartments in Charleston, SC, underwent a critical disaster recovery project following a fire that engulfed one of the buildings.
Ferguson
In 2011, Ferguson in Raleigh, NC, found itself in the aftermath of a tornado, leading to a critical disaster recovery project.
NC Moulding Project
In 2023, the NC Moulding project in Lexington, NC, unfolded as a distinctive and time-sensitive structural engineering venture classified under both disaster recovery and specialty projects.




